When the ride begins, the train is pulled backwards up the lift hill, then dropped through the loading station and into a cobra roll and then one Vertical Loop. At the end of this cycle the train is pulled up the lift hill at the end of the track, then dropped once again allowing the train to go back through the design backwards.